Context
A fintech production environment required improved resilience, clearer traffic separation, and a more reliable disaster recovery (DR) strategy due to growing system dependencies.
Challenge
- Single points of failure in network routing
- Limited visibility during failover scenarios
- Tight uptime requirements for production services
Actions Taken
- Redesigned on-prem and DR network topology
- Implemented VLAN-based segmentation for critical systems
- Configured gateway failover and routing policies
- Coordinated changes with datacenter remote hands (Vitro)
Outcome
- Improved network resilience and failover reliability
- Reduced operational risk during maintenance and incidents
- Clearer separation between production, management, and DR traffic